This pre-seen was for an earlier sitting. Sitting SCS next? Read our summary of the current Vennlisk pre-seen.
The Leothayre sitting has passed: its exams ran on 21 to 23 May 2025 and 20 to 22 August 2025. If you are preparing now, the current SCS pre-seen is Vennlisk; start with our Vennlisk summary and the Vennlisk case study page.
What follows was written for the Leothayre sitting. It is our own summary of the pre-seen for the CIMA Strategic Case Study (SCS). CIMA's pre-seen is on the CGMA Study Hub, where CIMA also publishes past pre-seens and, for some sittings, post-exam materials. Read it in full alongside this summary.
The company in brief
Leothayre is a listed company in Wexland, a fictional country whose currency is the W$. It was founded in 2004 and joined the Wexlandian stock exchange in 2017. It offers a complete service for small satellites, mostly in low Earth orbit, from an opening conversation about a client's mission through to running the satellite once it is in space.
The service has four parts:
- Mission advice. Engineers work out what the client is trying to achieve. The mission decides the sensors, which decide the size of the satellite and the cost of launching it.
- Design, build and test. Leothayre builds satellites of 1kg to 75kg in its own workshops, using space-certified components, and tests them for vibration, heat, cold and vacuum. Its Leothayre Standard is a CubeSat body in 3U, 6U or 12U sizes that can be adapted to almost any sensor, which shortens build times.
- Launch. It has no rockets of its own. It negotiates launch slots with several launch providers, or hands finished satellites to clients who arrange their own launch.
- Operation. It owns and runs ground stations that send instructions to satellites and collect their data.
It has launched 64 satellites, all its own design, and has a substantial order book. A typical mission takes 12 to 18 months; a repeat build can take as little as four to six. Ownership passes to the client when the satellite reaches the launch site, and clients pay in stages as the build progresses.
The key themes in the pre-seen are:
- a young, fast-growing industry with changing regulation
- dependence on a few large clients and on component suppliers
- reliance on third-party launch providers
- space debris and the environmental cost of launches
- the results of its closest rival, Orbalinc
- the board, its principal risks and the share price.
Your role
You are a senior manager in Leothayre's finance function, reporting directly to the board and advising on special projects and strategy.
That makes you a trusted adviser to people who are, mostly, engineers. The CEO, Dr Robert Suwaj, joined when the company was founded; the operations and technology directors both come from aerospace. The CFO, Gamze Elmas, came from a bank where she negotiated loans for technology start-ups. When you write, give the board the commercial and financial consequence of what the engineers propose, and a clear recommendation when the task asks for one.
The syllabus at this level is E3, P3 and F3: strategy and options, digital and technology strategy, enterprise and cyber risk, financing and valuation, and stakeholder and ethical issues.
Key figures to know
The pre-seen gives two years of results for Leothayre and for Orbalinc, both to 31 March. A few headline figures are worth knowing well:
- Leothayre's revenue rose from W$1,683 million to W$1,782 million, about 6%. Operating profit rose from W$528 million to W$656 million.
- Finance costs rose from W$350 million to W$450 million, as borrowings went from W$3,500 million to W$4,500 million. Profit for the year was W$175 million, and the dividend W$65 million.
- Orbalinc is larger: revenue of W$2,566 million, up about 13%, and profit of W$335 million on similar borrowings of W$5,000 million.
- Leothayre's beta is 1.15, and a share price chart is included.
Our reading of those numbers: Leothayre runs a good operating margin, but interest takes most of its operating profit, and its rival is growing faster. The pre-seen doesn't draw that conclusion; it is our calculation. Build a one-page figures sheet with margins, interest cover, gearing and growth for both companies, so you can judge any new cost or bid price against the size of the business at once.
Themes the pre-seen opens up
Nobody outside CIMA knew what the unseen would contain. What the pre-seen does is open up themes, and these are the ones we would have revised around:
- Growth and capacity. A strong order book and a small number of big clients raise questions about how fast to grow, whether to build or buy capacity, and what happens if a key client leaves.
- Constellations and new markets. The pre-seen describes constellations of hundreds of small satellites and services such as local weather forecasts for farms. Our reading is that any move from building single satellites to running services would change the risk profile.
- Launch access. Without its own rockets, Leothayre relies on launch partners to meet client deadlines. Delays, price rises or a partner failing are natural pressure points.
- Supply chain and quality. Every component must survive space. A faulty part, a delayed supplier or a satellite failing in orbit puts the reputation for meeting deadlines at risk, even though clients carry the in-orbit risk under the contract.
- Regulation and space debris. Wexland has signed a voluntary charter on space junk. The pre-seen doesn't say it will become law, but designing satellites to fall out of orbit costs more, and clients and regulators may care.
- Environmental impact of launches. Rocket emissions in the upper atmosphere are a reputational issue for anyone in the industry.
- Financing. Heavy borrowing and rising finance costs limit choices. Debt against equity, dividend policy and the cost of capital all sit naturally here.
- Valuation and acquisitions. Orbalinc is a rival of similar shape. Valuing a target, responding to an approach, or reading the share price are all in scope.
- Treasury. Clients are in several countries, and the principal risks mention exchange rates.
- Governance and ethics. One non-executive's research used data from Leothayre's clients; another sat on the inquiry into Wexland's spaceport. Our reading is that independence and conflicts of interest are worth thinking about.
- Cyber risk. Ground stations send commands to satellites and receive client data.
Use this list to check your revision, not to write answers in advance.
How to prepare
Read the pre-seen twice. First for the story: what a small-satellite business does and how it earns money. Then as the board's adviser: what decisions are coming, and who gains or loses from each?
Learn enough of the industry. The early pages on orbits, CubeSats, ground stations and launches are there for a reason. You don't need to be an engineer, but you should be able to explain why small satellites are cheaper and why launch location matters.
Write the strategy in a paragraph. What Leothayre does, how it makes money, what threatens it and where the opportunities are. Test every option in the exam against that paragraph.
Revise E3, P3 and F3 through Leothayre. A valuation method sticks when you have tried it on Orbalinc. A risk framework is easier to use when you have applied it to a satellite failing after launch.
Practise recommending. Say what, why, the main risk and the next step.
Keep people in every answer. Clients, launch partners, staff, shareholders, lenders and regulators.
Do timed practice and full mocks. Three hours in exam order shows you where your time goes.
Review every answer. Did you answer the verb, use the trigger, tie each point to Leothayre and give a clear recommendation where one was asked for?
Practise for the current pre-seen